In our on going project, there is an area where the new raise floor meets the old one that is not flush. The problem is that the old part is not leveled, it has an slope towards the subfloor, creating a 3/4 step.. My idea is to use concrete over that old floor to make it leveled with the new floor. However, we do not know that this would work because of the flooring that is there. Can anyone give me some advice?
Thanks. Be well
Miriam
P.s. I will try to post some pics to make easier to understand.
In our on going project, there is an area where the new raise floor meets the old one that is not flush. The problem is that the old part is not leveled, it has an slope towards the subfloor, creating a 3/4 step.. My idea is to use concrete over that old floor to make it leveled with the new floor. However, we do not know that this would work because of the flooring that is there. Can anyone give me some advice?