B
billhead1
Guest
Due to settling of my carport slab, the mortar between the upper course of brick (soldier brick) on the exterior load-bearing wall of the foundation has become cracked. I have stabilized the foundation with helical piles and cement.
Do I need to remove as much of the old mortar as possible before retooling with new mortar?
Do I need to remove as much of the old mortar as possible before retooling with new mortar?