I'm installing new pvc in my house and have taken out all of the old galvanized pipes. I would like to replace everything back to the meter with new pvc. How difficult is it connecting to the meter? Or can I use a compression fitting (not sure if thats the right term) to connect the gal. to the pvc about 8ft from the foundation? I have about 25ft to the meter. I would rather not connect to the gal. with the fitting but I don't want to get the city involved either.