I wanted to open a hole in the floor, this would be a second access to the basement as when my deck was built (Before me) they placed the deck over the bulkhead.
What i wanted to do was build a 48" x 48" false floor access to the bulkhead. right now the floor joists are roughly 16" apart as they should be and the joists are 2x6.
I'm not sure where to start, im familiar enough with making a 2x8 48" rectangle box but as for any other stuff im not sure what to do.
The floor will be a 3/4" and some kind of bracing as i wanted to be able to walk on it when its down.
Any suggestions or pushes towards where to start? Thanks
What i wanted to do was build a 48" x 48" false floor access to the bulkhead. right now the floor joists are roughly 16" apart as they should be and the joists are 2x6.
I'm not sure where to start, im familiar enough with making a 2x8 48" rectangle box but as for any other stuff im not sure what to do.
The floor will be a 3/4" and some kind of bracing as i wanted to be able to walk on it when its down.
Any suggestions or pushes towards where to start? Thanks