PaPaDan
Well-Known Member
- Joined
- Mar 7, 2006
- Messages
- 75
- Reaction score
- 0
Spent the morning playing carpenter and all went well. Then traded my nail apron in for my meter and started playing sparky games. 2 bedrooms had light switches that controlled wall outlets, my son wanted cieling lights instead. No big deal (#&*$@#*)$(%@) Found out the original 60 amp fuse panel had been replaced in 91 and a lot of new circuits added. It's a dam good thing the fool who did this job didn't put a name or business sticker anywhere, or I would be in jail for murder. All original circuits are fine considering they are the old cloth covered wires, none are brittle or falling apart. All new circuits added were done with 14/2 romex. Notice I did not say 14/2 w/ground? If that was not bad enough, they dam guy did NOT know what a wire nut was. Every junction box or connection in the wiring was done by twist and tape. Every outlet and switch was the push in type, no screw connectors on the sides of any of them. All junction boxes were under the attick floor boards, not mounted, and not covered. From noon until 8:30 this evening I was playing sparky and it will be sun-up to sun-down again tommorow. Dam,I want a piece of somebodys A$$