flowergirlavon
New Member
- Joined
- Jul 13, 2009
- Messages
- 1
- Reaction score
- 0
Hello,
I had a new cement patio pour about two weeks ago. When they first took out the old cement patio it had pour down rain (about a inch or 2) and I notified the person installing the new patio that there was a small creek in my basement. (about 1 bucket full the every hour for about 3 hours). He told me don't worry about it, things will be okay once the cement is in. He never came to see the leak. Now we had a another rain storm (about an inch of rain), the cement has been there for ten days and I had another small creek in my basement. Call the cement installer and said he would try to come see what the problem is. I've already ruin my painted basement floor, what can I do to fix this problem. I don't see any holes or cracks, but it leaking where the floor meets the wall.
Thanks for everyone's help
I had a new cement patio pour about two weeks ago. When they first took out the old cement patio it had pour down rain (about a inch or 2) and I notified the person installing the new patio that there was a small creek in my basement. (about 1 bucket full the every hour for about 3 hours). He told me don't worry about it, things will be okay once the cement is in. He never came to see the leak. Now we had a another rain storm (about an inch of rain), the cement has been there for ten days and I had another small creek in my basement. Call the cement installer and said he would try to come see what the problem is. I've already ruin my painted basement floor, what can I do to fix this problem. I don't see any holes or cracks, but it leaking where the floor meets the wall.
Thanks for everyone's help