Hi Neal, yes i am a bit confused as what to do. I want to get this room done first so i have somewhere to sleep and put my stuff.
On the other side of the room a piece of the gypsum board is not quiet connected and i could looking in - it is black as in no insulation.
Should i pull off some of the gypsum board and check it? What i assume is he put some of that polystyrene and some space and then would be the old roof and outside the metal.
There are vents all along on the outside of the roof on both sides. He also says i should not cover the front eves draught and put a vent there as well.
So would the infragun reader tell me the story? Should i poke holes or tear out?
Again i'm confused because what i understood is that if get insulation blown, the sticky chemical stuff, is that the it wouldn't need air spaces? That what i seem to read anyways.
Should i get a guy to blow the chemical insulation in the walls first? I though the air would between the metal rood and the old roof and this knee wall is another foot or two that could be complete filled in?