thegogetter222
Well-Known Member
- Joined
- Oct 20, 2011
- Messages
- 60
- Reaction score
- 1
Hey guys, I was going to install 4 corner anchors to our kids playground system today and it just so happens that its been lightly raining for the past 24hours and everything is quite muddy... like it sticks to your feet until you have double the size of your foot : ( Not pleasant. This is primarily for the swing set portion of the playground where the perpendicular swinging tends to pull the frame ends off the ground.
I purchased a bag of Quikrete 5000 - http://www.quikrete.com/ProductLines/Quikrete5000ConcreteMix.asp - and plan to use this for my footings. I will auger a 3-4' deep by 4" diameter footing with a 1/2" threaded rod sticking out of it.
- am I able to do this in the current muddy conditions or should i allow the area to dry?
There is no standing water above ground at this point. because its wet outside I can keep the kids away for as long as needed to allow curing.
thanks in advance for any suggestions.
I purchased a bag of Quikrete 5000 - http://www.quikrete.com/ProductLines/Quikrete5000ConcreteMix.asp - and plan to use this for my footings. I will auger a 3-4' deep by 4" diameter footing with a 1/2" threaded rod sticking out of it.
- am I able to do this in the current muddy conditions or should i allow the area to dry?
There is no standing water above ground at this point. because its wet outside I can keep the kids away for as long as needed to allow curing.
thanks in advance for any suggestions.