DIY Home Improvement, Remodeling & Repair Forum > DIY Home Improvement > Walls and Ceilings > Removing a support header




Reply
 
Thread Tools Search this Thread Display Modes
Old 06-16-2011, 08:01 AM  
zinger77
Junior Member
 
Join Date: Jun 2011
Location: wauwatosa, WI
Posts: 12
Default Removing a support header

We would like to remove the wall that has a support header or cut out much of a frame of that wall.
We have a ranch that was built in 1954. We got advice from a couple of carpenter friends of ours on how to reinforce it from above before removing the header.
My question is - is there still a need to contact a structural engineer or does a carpenter have the expertise needed to make the call?



__________________
zinger77 is offline  
 
Reply With Quote Quick reply to this message
Old 06-16-2011, 05:48 PM  
oldognewtrick
Moderator
HRT_MODERATOR.png
 
oldognewtrick's Avatar
 
Join Date: Jul 2009
Location: Nashville, TN
Posts: 5,879
Liked 511 Times on 425 Posts
Likes Given: 150

Default

[QUOTE=zinger77;57986]We would like to remove the wall that has a support header or cut out much of a frame of that wall.
We have a ranch that was built in 1954. We got advice from a couple of carpenter friends of ours on how to reinforce it from above before removing the header.
My question is - is there still a need to contact a structural engineer or does a carpenter have the expertise needed to make the call?[/QUOTE]

Well, your choices are call an engineer and be safe or take a chance to dump the structure on your head on the recommendation of your carpenter friends who may or may not know what they are talking about.

Shouldn't cost to much for a couple hours the the structural guys time, my 2 cents, money well spent.

OH...and welcome to House Repair Talk!



__________________
oldognewtrick is online now  
 
Reply With Quote Quick reply to this message
Old 06-16-2011, 06:25 PM  
nealtw
Contractor
 
Join Date: Nov 2010
Location: vancouver, b.c.
Posts: 10,980
Liked 965 Times on 858 Posts
Likes Given: 1650

Default

Headers support the stuff above, If the stuff above can supprot the header you don't need the header and I haven't seen to many headers that one dosn't need. What you need an engineer or at least more details.

__________________
nealtw is offline  
 
Reply With Quote Quick reply to this message
Old 06-21-2011, 06:16 PM  
zinger77
Junior Member
 
Join Date: Jun 2011
Location: wauwatosa, WI
Posts: 12
Default

Well, we had an engineer come over. Lets just say I am a cheap bastard and we won't be removing the header after all. However, he did think it was strange that there is nothing in the basement to reinforce the header.
Anyways... here is a follow up question.
If you look at the pics - there are joists that rest on that header. As you can see - there are studs underneath. there used to be a 1/2 wall there with cabinets hung on it.
So, my 1st question is - can i move the stud on the right about 20 inches over. Obviously, i would build a new one first and then remove the existing one. 2nd - is it possible to get rid of the stud that the ladder is resting on all together.
wall pictures by inazinger - Photobucket

__________________
zinger77 is offline  
 
Reply With Quote Quick reply to this message
Old 06-21-2011, 06:18 PM  
zinger77
Junior Member
 
Join Date: Jun 2011
Location: wauwatosa, WI
Posts: 12
Default

BTW - the cost for an engineer is more than a couple of hours. We had 3 different ones tell us that the job will be between 15-20 hours. Most of them charge $90 and up.

__________________
zinger77 is offline  
 
Reply With Quote Quick reply to this message
Old 06-21-2011, 06:22 PM  
zinger77
Junior Member
 
Join Date: Jun 2011
Location: wauwatosa, WI
Posts: 12
Default

wall pictures by inazinger - Photobucket
Can someone tell me if i can remove the stud behind the header and move the one on right about 20 inches left? I am leaving the header alone. I can't afford the engineer and will take your advice.
__________________
zinger77 is offline  
 
Reply With Quote Quick reply to this message
Old 06-21-2011, 06:38 PM  
nealtw
Contractor
 
Join Date: Nov 2010
Location: vancouver, b.c.
Posts: 10,980
Liked 965 Times on 858 Posts
Likes Given: 1650

Default

Looking at your picture, what you have is a bearing wall that has been cut away for the openings that you have. There is no header in place and should be corrected asap. If you look up you will see that the floor joists join over the wall and you will have to check whats above like walls above that are bearing the roof load. The whole wall must be replaced with a beam.
I understand the pain but I will still suggest an engineer. evan if you can figure all the loads on this beam, you still have to transfer all that weight to the foundation which may or may not be substancial enough for that weight.

__________________
nealtw is offline  
 
Reply With Quote Quick reply to this message
Old 06-21-2011, 08:34 PM  
zinger77
Junior Member
 
Join Date: Jun 2011
Location: wauwatosa, WI
Posts: 12
Default

well, we simply can't afford an engineer. This is how the house was built and it's been this way for 60 years with no issues. On that note, i simply need to know if I can move over the right stud over. That simple. Second opinions?

__________________
zinger77 is offline  
 
Reply With Quote Quick reply to this message
Old 06-22-2011, 07:18 AM  
inspectorD
Housebroken
HRT_MODERATOR.png
 
inspectorD's Avatar
 
Join Date: Dec 2005
Location: Litchfield, CT
Posts: 4,117
Liked 134 Times on 112 Posts
Likes Given: 340

Default Ok

Um, No. You need to evaluate what the load is carrying.

Lets see what we can figure out.
Does the sheetrock behind the post have a solid piece, or pieces of 2x4?
What does the top part of that wall look like behind the sheetrock also. I think there may be 2x4s stacked on top of each other, or is there a small beam under those short cripple studs?

Do the post supports have anything underneath it where it sits on the floor?

Is the attic above this area carrying any posts?

And finally, your engineers are idiots, this will take 2 hrs at the most!! try your local building supply company, see if they have someone on staff who wants to sell you an LVL beam. Laminated veneer lumber. Then take this info to your Building department, and please get a permit, this is what those guy's and gal's are here for. To keep you safe!!, and give free advice.

__________________

Just My
Made in the

inspectorD is offline  
 
Reply With Quote Quick reply to this message
Old 06-22-2011, 08:48 AM  
zinger77
Junior Member
 
Join Date: Jun 2011
Location: wauwatosa, WI
Posts: 12
Default

Does the sheetrock behind the post have a solid piece, or pieces of 2x4?

Answer: there are 2 2x4 next to each other

What does the top part of that wall look like behind the sheetrock also. I think there may be 2x4s stacked on top of each other, or is there a small beam under those short cripple studs?

Answer: The studs underneath the cripples are 3 2x4 stacked sideways next to each
other.

Do the post supports have anything underneath it where it sits on the floor?
Answer: There is a 4ft sole plate between the middle opening, but that's it. There is no reinforcement in the basement of any sort either.



__________________
zinger77 is offline  
 
Reply With Quote Quick reply to this message
Reply


Quick Reply
Message:
Options

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Threads
Thread Thread Starter DIY Home Repair Forum Replies Last Post
Rotten header joist STLC1215 Introductions 2 11-08-2010 11:49 PM
Cracks in header harsuwind Framing and Foundation 4 11-08-2010 11:41 PM
garage door header butcher757 Framing and Foundation 6 09-10-2008 09:50 AM
Header problems electech46 Framing and Foundation 4 04-30-2008 10:01 AM
Header for new patio door maritadavis Windows and Doors 3 05-15-2007 09:22 AM

Newest Threads

LATEST SPONSOR DEALS