DIY Home Improvement, Remodeling & Repair Forum > DIY Home Improvement > Walls and Ceilings > Best method for locating studs when installing drywall




Reply
 
Thread Tools Search this Thread Display Modes
Old 09-23-2013, 06:58 AM  
brainparr
Junior Member
 
Join Date: Sep 2013
Posts: 1
Default Best method for locating studs when installing drywall

I'm looking for a consensus on the best method for locating/marking stud locations when installing a 4x8 sheet of drywall.
It appears that the pros tend to eyeball it, but I haven't had much luck with that. I'm doing a large basement finishing project and need a method that will allow me to work quickly and accurately (i.e. not miss the studs with my screws).
Thanks!


__________________
brainparr is offline  
 
Reply With Quote Quick reply to this message
Old 09-23-2013, 07:11 AM  
nealtw
Contractor
 
Join Date: Nov 2010
Location: vancouver, b.c.
Posts: 10,980
Liked 965 Times on 858 Posts
Likes Given: 1650

Default

Put marks on ceiling and floor before you put the sheet in place and put a stud against it after you it is in place, just beside where the screws go and it will be easy to line up the screws.



__________________
nealtw is offline  
 
Reply With Quote Quick reply to this message
Old 09-23-2013, 08:06 AM  
Drywallinfo
Senior Member
 
Join Date: May 2013
Posts: 144
Liked 29 Times on 24 Posts
Likes Given: 9

Default

Marks or small strips of tape top and bottom before you put the sheet on, as Neal suggests. And if needed draw a straight line from top to bottom on your drywall.

__________________

- Taping & Finishing Drywall Joints
- Inside & Outside Corner Drywall Joints
- How to Repair Small and Big Holes
- How to Build and Finish Drywall Arches
- How to Apply or Repair Texture
Free Tutorials at http://www.drywallinfo.com

Drywallinfo is offline  
 
Reply With Quote Quick reply to this message
Old 09-23-2013, 08:27 AM  
bud16415
Fixer Upper
 
bud16415's Avatar
 
Join Date: Feb 2013
Location: Erie Pa, Pa
Posts: 1,375
Liked 421 Times on 329 Posts
Likes Given: 137

Default

All the drywall I have hung lately have marks at 16 and 24 inch to help with screwing in the field. I also use the marks at the floor and ceiling and ether use a stud or a 4’ level to transfer a line. I recently covered some plaster ceilings with drywall that were badly damaged and super old construction where center distance wasn’t always right on the mark. I located each joist on the ends of the room by screwing test screws thru the old plaster finding the joist center and then snapping a chalk line before ever lifting the first sheet.

To me the trick is really in the framing and taking the time to get those members located very accurately on the 16’s. make sure that first sheet is perfect and the rest will follow. Nothing worse than trying to adjust mid-stream.

__________________
bud16415 is offline  
nealtw Likes This 
Reply With Quote Quick reply to this message
Reply


Quick Reply
Message:
Options

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Threads
Thread Thread Starter DIY Home Repair Forum Replies Last Post
How would I replace ceiling tiles with drywall on a ceiling that has no studs? weedelf Walls and Ceilings 2 02-24-2011 07:58 AM
Prime drywall before installing wainscoting? ltlredwagon Walls and Ceilings 2 07-25-2010 06:44 PM
Refinish tub method Jinglebob Plumbing Forum 1 11-15-2009 11:23 PM
Best Method: Floor Demo dtenorio Flooring 2 08-15-2006 03:22 AM
Locating Locations In Attic delbert Electrical and Wiring 1 01-01-2006 11:03 AM

Newest Threads

LATEST SPONSOR DEALS