Default Finished basement not level.

Hi all,

I purchased a home last year and got a phenomenal deal, or so I hope. I recently started working on the basement as my wife and I have finished the upstairs. In one of the finished rooms we noticed a gradual slope from one end to the other of about 3.5". The exposed foundation on the house shows no signs of cracks and the upstairs is level. Also, the tiling/mortar is not cracked in the basement.

Why would the builders put a gradient in?

The house was built in the 1990s. There is no sump pump as there is adequate drainage away from the house.

Our goal is to level the basement room. So it can be used as a man cave.

Currently, we are looking at possibly pouring a concrete layer to bring up the slope.



Last edited by NAWalton00; 01-10-2014 at 06:25 PM.
NAWalton00 is offline  
 
Reply With Quote
Old 01-10-2014, 07:04 PM  
nealtw
Contractor
Join Date: Nov 2010
Location: Upper Fraser Valley, British Columbia
Posts: 13,550
Liked 1358 Times on 1198 Posts
Likes Given: 2340

Default

I would bet the foundation is much deeper under ground on one end or side of the house. The builder leveled it with sand or gravel or mud and didn't compact the fill and now it has settled. Look for hints like a chalk line on the foundation where the floor was pored. If that is the case there outfits than can bring it back up. They can pump concrete or foam under the slab. Placing concrete over it can be done, it has it's own problems and has to be done correctly. The other option would be to put in tapered 2x4s like floor joist and put in a plywood floor.


nealtw is offline  
 
Reply With Quote
Old 01-10-2014, 07:53 PM  
NAWalton00
Junior Member
Join Date: Jun 2013
Posts: 20
Liked 1 Times on 1 Posts

Default

nealtw,

Since it is a finished basement would pumping gravel / mud under the slab cause any issue with destroying the walls? I am wondering if maybe using taperer 2x4s could avoid redoing the framing. Putting down cement was my original thought but was concerned that it would cause more problems.
NAWalton00 is offline  
 
Reply With Quote
Old 01-10-2014, 08:08 PM  
nealtw
Contractor
Join Date: Nov 2010
Location: Upper Fraser Valley, British Columbia
Posts: 13,550
Liked 1358 Times on 1198 Posts
Likes Given: 2340

Default

Lifting the floor or pouring concrete would require the walls be removed. Before you cover it up take few munite and tap the floor with a small hammer if you have voids under it you will hear a hollow sound. If you find large areas of void I would call in the foam guys just to stabilize it before any real problems show up under a brand new wood floor.
nealtw is offline  
kok328 Likes This 
Reply With Quote
Old 01-10-2014, 08:56 PM  
NAWalton00
Junior Member
Join Date: Jun 2013
Posts: 20
Liked 1 Times on 1 Posts

Default

Ok thanks.
NAWalton00 is offline  
 
Reply With Quote
Old 01-11-2014, 10:13 AM  
JoeD
Contractor
Join Date: Mar 2006
Location: Welland, Ontario
Posts: 1,093
Liked 136 Times on 111 Posts
Likes Given: 4

Default

Is it just the floor that slopes? All basement floors slope. They are not flat. 3.5" seems like a lot but it likely was done on purpose to slope towards the floor drain.
JoeD is offline  
 
Reply With Quote
Old 01-11-2014, 11:17 AM  
NAWalton00
Junior Member
Join Date: Jun 2013
Posts: 20
Liked 1 Times on 1 Posts

Default

Yes, the slope seems gradually over the entire 30' length of the floor and the original builders finished the basement with this slope. It may be slightly less than 3.5", maybe 2.5" its a little difficult to tell with the equipment I have.
NAWalton00 is offline  
 
Reply With Quote
Old 01-12-2014, 12:00 AM  
GBR
Senior Member
Join Date: Mar 2009
Posts: 356
Liked 26 Times on 25 Posts
Likes Given: 9

Default

Is there an interior drain?

Did you examine the wall/slab joint for settling signs?

Did you measure to the floor joists/slab?

Use a laser level, rent one for a 1/2 day... let us know the outcome.

Gary
GBR is offline  
 
Reply With Quote
Old 01-12-2014, 10:47 AM  
kok328
Supporting Member
HRT_SUPPORTER.png
Join Date: Nov 2007
Location: Grand Blanc, MI
Posts: 2,338
Liked 148 Times on 126 Posts
Likes Given: 71

Default

I would not recommend "mud jacking".
Is it done settling or will it drop some more?
You can get a pretty good idea just by measuring with any type of laser beam laid flat on the high side of the floor.
kok328 is offline  
 
Reply With Quote
Old 01-12-2014, 03:28 PM  
NAWalton00
Junior Member
Join Date: Jun 2013
Posts: 20
Liked 1 Times on 1 Posts

Default

I'm not sure if I want to go down the mid jacking route if at all possible. Got a laser level, which is amazing, the actual slope of 30 feet is about 1.75". It appears the first 0.5" is over 15ft and then the other 1.25" for the rest.


NAWalton00 is offline  
 
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Threads
Thread Thread Starter DIY Home Repair Forum Replies Last Post
Help design my basement! Unfinished level! slayousss Decorating and Design 11 10-16-2012 09:46 PM
installing french drains in finished basement toby General Home Improvement Discussion 3 12-05-2011 03:43 PM
Wood Foundation - Water in finished basement mcoriell Framing and Foundation 1 11-29-2011 06:51 PM
Water Leaking into Finished Basement homesweethome77 General Home Improvement Discussion 1 06-16-2009 01:30 AM
finished basement:mild musty odor spaniel General Home Improvement Discussion 11 01-30-2007 06:30 PM

Newest Threads

LATEST SPONSOR DEALS