DIY Home Improvement, Remodeling & Repair Forum > DIY Home Improvement > General Home Improvement Discussion > Dormer wall gap- repair




Reply
 
Thread Tools Search this Thread Display Modes
Old 01-05-2010, 01:13 PM  
jhall
Junior Member
Join Date: Jan 2010
Posts: 4
Default Dormer wall gap- repair

Hi. I have a 1 1/2 story Cape Cod style house. In 1984 I built a shed dormer across the back. The wall-ceiling joint in one room has kept breaking apart. At first I just retaped it and repaired it. It would only last till the weather would change. In the winter time everything contracts and the gap would gone. However in the summer time the roof, wall everything expands and the gap will reach at least an 1 1/2".

The side walls are built in from the roof edge abvout 8"- 12". The wall is built from the floor to under roof rafter. The drywall is attached to the ceiling joist untill it gets about 3 feet from the back wall. There it is attached directly to the rafter. Due to roof pitch restaints we had to lower the back wall. The worst part is where the where the drywall is attached to the ceiling joist. The angle part (last 3') is cracked but dosen't expand that much. The ceiling in the center, right under the peak (about 18" - 24" between ceiling and ridge) is fine. It's really hard to paint a picture of this but I am trying. I hope it's clearer than mud.

I have seen the cause of this adressed years ago in a newspaper colum. Gary Sullivan I believe. Of course I forgot. I need help figuring the cause and a solution. I remember the a proper repair was quite involved. Please help me solve this problem


jhall is offline  
 
Reply With Quote
Old 01-05-2010, 04:17 PM  
oldognewtrick
Moderator
HRT_ADMIN.png
 
oldognewtrick's Avatar
Join Date: Jul 2009
Location: Nashville, TN
Posts: 7,230
Liked 721 Times on 592 Posts
Likes Given: 230

Default

Can you post a picture of the crack?


oldognewtrick is offline  
 
Reply With Quote
Old 01-06-2010, 02:31 PM  
jhall
Junior Member
Join Date: Jan 2010
Posts: 4
Default

No not at this time. I think the problem is "truss deflection". I posted it backwards. The gap is wider in the winter and closes in summer. The ceiling joist is warmed and the rafter it attaches to is cold. The guy at the local lumber yard had the answer for me. Thanks.
jhall is offline  
 
Reply With Quote
Old 01-06-2010, 07:00 PM  
inspectorD
Housebroken
HRT_ADMIN.png
 
inspectorD's Avatar
Join Date: Dec 2005
Location: Litchfield, CT
Posts: 4,260
Liked 187 Times on 156 Posts
Likes Given: 464

Default yup

And what was the answer??
A piece of molding nailed to the joists only will solve your issue.
__________________
Just My
Made in the
inspectorD is offline  
 
Reply With Quote
Old 01-07-2010, 11:15 AM  
jhall
Junior Member
Join Date: Jan 2010
Posts: 4
Default

The answer was as you suggest is to put moulding up and just nail it to the ceiling so it will move up and down the wall. Or........ rip the end off unnail the sidewall from the rafter. Reattach with metal plates that allow for expansion. Moulding sounds good.
jhall is offline  
 
Reply With Quote
Old 01-08-2010, 08:37 AM  
inspectorD
Housebroken
HRT_ADMIN.png
 
inspectorD's Avatar
Join Date: Dec 2005
Location: Litchfield, CT
Posts: 4,260
Liked 187 Times on 156 Posts
Likes Given: 464

Default Sounds great

Glad it works for you.
This is what is usually done on a truss roof building also. When a house has trusses, they get truss uplift and the ceilings almost always crack at the wall joints....moulding solves the problem before anyone see's it.
__________________
Just My
Made in the
inspectorD is offline  
 
Reply With Quote
Old 01-08-2010, 07:55 PM  
GBR
Senior Member
Join Date: Mar 2009
Posts: 356
Liked 26 Times on 25 Posts
Likes Given: 9

Default

Look at figure 2, floating corner at the ceiling: http://bestdrywall.com/files/ReduceCallbacks.pdf

Instead of nailing with-in 7" of the wall, install a 2"x2" metal flashing on the wall only, then screw the ceiling drywall to that. No screws into the corner ceiling backing or framing. It moves with the wall, especially if the next rafter is 2' away. More room to flex more.

Be safe, Gary
GBR is offline  
 
Reply With Quote
Old 01-20-2010, 12:30 PM  
jhall
Junior Member
Join Date: Jan 2010
Posts: 4
Default

Great Idea. That was a very informative article. I need to do something soon while the gap is at maximum warp factor.


jhall is offline  
 
Reply With Quote
Reply


Tags
ceiling, dormer

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Threads
Thread Thread Starter DIY Home Repair Forum Replies Last Post
Cement porch wall repair help please! patnmike427 Bricks, Masonry and Concrete 4 07-06-2009 10:44 AM
wall repair... sheetrock? ADWill9 Walls and Ceilings 7 05-05-2009 07:24 PM
I need advice re. redoing dormer apsinkus Roofing and Siding 15 04-29-2008 09:12 AM
Anyone used Hightech Dormer people? apsinkus Roofing and Siding 3 03-10-2008 07:26 AM
PWF Foundation Wall Repair Questions gc9713 Framing and Foundation 1 11-15-2007 11:09 AM

Newest Threads

LATEST SPONSOR DEALS