60A in main aswell as in sub
Made her well aware to leave both breakers off. When I go back today I'll be tagging it out and leaving all my notes just in case. Thing hasnt even been used since she got it a year ago. Probably has even more issues at the hot tub. So I'm tagging out and letting...
Yeah I may not be an expert but when I first looked at it I was like are you kidding me? How did they not notice the breaker voltage? Lol
She had 2 friends over previously looking at it and everyone just immediately troubleshot the hottub main board. I checked the breaker at subpanel 1st and...
She's not home to ask for those. I told her to get an electrician out to fix it properly. Did the minor troubleshooting I knew and provided her the info for them to have an idea of where to start. The guy she had out that installed everything originally wasn't an electrician so probably going to...
Okay I'll check the breaker in the load center when I get back out there. Should the Ground bar and Neutral bar have a jumper bar connecting the two in the load center? Or is that only because everything currently is 120V only?
Hot tub is approximately 8ft away. The breaker I supplied is a GFCI breaker is a subpanel
Unsure about the 240 breaker since I didnt wire any of it. Sounds like she is going to need an electrician to come out and work the main breaker box so I dont screw it up.
From what I saw inside the...
This hot tub has a Neutral. I have the pigtail going to neutral bar and hot tub neutral going to breaker. So the Neutral bar at sub panel ONLY has neutral pigtail and hot tub neutral, no wire from main breaker panel.
At the Subpanel both legs have 120V when you check with ground, but going...
So my friend had an ex install a subpanel out on a separated deck for a hot tub. They couldn't get the hot tub main board to power on. I come over one day and found the following:
•Subpanel has 2 hot legs and a ground coming in.
•Using 60amp GFCI 220v breaker
•Load Neutral coming from the...