O ic what your getting at now.
The question seemed a little retorical.
I plan on slowly raising the floor the required amount over time.
I'm just going to snug it up then crank it up a couple turns on the jacks and wait a week or so.
The beam is more to take the bounce out of the floor...
Thanks guys.
Turned out I can just call a struss company. There engineer did all the math for me and said I would good with tripple 2x10's posts at 10' intervals.
Thanks for all the input.
5 ft. In most of the space. But about 40' of dirt 2' high was left on one end.
I'd like to have it all flat and use a 12mm Polly to make the area a dry space for worrie free storage
Well since that's out of the way, thanks everyone for there help and input,
How could I go about removing some dirt from under there?.
I'm looking at about 1,100 cu/ft.
I wonder.how.hard a conveyor system would cost to build.
This was my thought when it came to the beam. It's only really supporting a 7' span I didn't think I would have to go too crazy.
Honestly I thought 2x8s would do it, I thought wrong.