Hi,
I recently had a drain and sump pump put into a small portion of my finished basement. In order for that to be done they had to cut out about 3 feet of sheetrock and the studs that portion of the studs that were behind it. Also the floor board was removed in order to put the drain in. This is only a small section of one corner of the basement and is not a load bearing wall. The studs were only installed in order to put up the sheet rock. Can someone give me a little advice on the best method for fixing the sheetrock? I am guessing I need to first fix the studs in order to support the sheet rock.
I recently had a drain and sump pump put into a small portion of my finished basement. In order for that to be done they had to cut out about 3 feet of sheetrock and the studs that portion of the studs that were behind it. Also the floor board was removed in order to put the drain in. This is only a small section of one corner of the basement and is not a load bearing wall. The studs were only installed in order to put up the sheet rock. Can someone give me a little advice on the best method for fixing the sheetrock? I am guessing I need to first fix the studs in order to support the sheet rock.