Just curious if you guys are picky on this part that my contractor did.
We are adding a room to our house. The guys cut my existing shingles too much (about 4 inch near the bottom part, line isn't straight from top to bottom) before the metal T connector (not sure what its called). The T connector part still sits below the shingles since it is wider. Current pic won't show any detail. The contractor did put new singles underneath the current shingles and ran along the T Connector like they normally do.
Is this acceptable? I will try to get a closer up pic. Don't want to be too picky but just want to know what the consensus is.
Just curious if you guys are picky on this part that my contractor did.
We are adding a room to our house. The guys cut my existing shingles too much (about 4 inch near the bottom part, line isn't straight from top to bottom) before the metal T connector (not sure what its called). The T connector part still sits below the shingles since it is wider. Current pic won't show any detail. The contractor did put new singles underneath the current shingles and ran along the T Connector like they normally do.
Is this acceptable? I will try to get a closer up pic. Don't want to be too picky but just want to know what the consensus is.