mustanggarage
Garageaholic
- Joined
- Nov 26, 2009
- Messages
- 903
- Reaction score
- 0
I poured an 18 x 22 foot slab of concrete 6 inches thick in front of my main garage door last saturday. I have been watering it down a couple times a day, it is looking pretty good. how long should I wait before I can drive my f250 across it to get it back in my shop? I have read anywhere from 3 to 28 days. most say a week. any thoughts?