AlmostAble
New Member
Ok, so last summer I installed 8mm laminate flooring on a cement floor. I used a vapour barrier underlay. Floor is holding up well. I left a 1/4" gap around for expansion due to temperature.
The problem is, some of the slats are shifting. The flooring stated it did NOT need to be glued. But I'm thinking now that I should have.
Anyone have any ideas on how I can get the flooring to stay put?
Thanks in advance,
The problem is, some of the slats are shifting. The flooring stated it did NOT need to be glued. But I'm thinking now that I should have.
Anyone have any ideas on how I can get the flooring to stay put?
Thanks in advance,