The guy has deceived, lied, and basically I have had enough. I had him build a family room 16x20. Already paid 90% of the payment.
Last week, the inspector gave the OK to cover drywall with compound and put stucco for outside. They did one coat of stucco and about 80% of compound on drywall (no beads yet).
Deadline has already past and they worked only 3 hours a week. There was one time they worked 2 days in two months..
The scumbag has all the blueprint, etc. I believe we have only one inspection left. The last few inspections, the required docs weren't even needed except a sheet where the inspector signs of on the category.
Can I go to city hall and pay a fee to get those docs? I am assuming the inspector also records the inspection results on his own side. The permit was pulled under my name.
Assuming I am not the first to ever been lied to by contractors. I left a voice message for the inspector that came previous times. I want to know my options before I really throw a hammer at the contractor.
Right now I want to get this done.
Last week, the inspector gave the OK to cover drywall with compound and put stucco for outside. They did one coat of stucco and about 80% of compound on drywall (no beads yet).
Deadline has already past and they worked only 3 hours a week. There was one time they worked 2 days in two months..
The scumbag has all the blueprint, etc. I believe we have only one inspection left. The last few inspections, the required docs weren't even needed except a sheet where the inspector signs of on the category.
Can I go to city hall and pay a fee to get those docs? I am assuming the inspector also records the inspection results on his own side. The permit was pulled under my name.
Assuming I am not the first to ever been lied to by contractors. I left a voice message for the inspector that came previous times. I want to know my options before I really throw a hammer at the contractor.
Right now I want to get this done.
Last edited: