I am in the process of getting a condenser installed, the HVAC guy recommended a pre-cast plastic pad for the condenser to sit on.
I would rather use a concrete slab than a plastic pad, some friends told me that had issues where the pad moved, bent, collected water, etc...
My question is, which is the preferred method? If concrete is preferred, how big of a base should I make? 4'x4'? How far from the house should it be located? Thanks
I would rather use a concrete slab than a plastic pad, some friends told me that had issues where the pad moved, bent, collected water, etc...