Post elsewhere but I thought I might update this post with some new pictures of the project. Next up is tiling the bathroom floor and shower floor. After that comes around 800 square feet of LVP.
Images:
1. closet and bathroom doors
2. inside the pantry closet
3. pocket door inside bathroom, the HVAC is behind this door. A pocket door avoided all the door swing issues.
4. triple window, existing to the original build, now trimmed out
5. Above the workbench shelving
6. New sub panel, and handling the existing gas pipes
7. shower
8. toilet flange, now ready to start tiling. Getting this ready was Monday's project.