I bought head lock screws and screwed two every 12 inches. And inbetween those i scewed 2 4 inch screws stagered. Hurricane ties will make it easier to attach cj to load beam.
Ok it has taken me awhile to get everything ripped up and to get measurements for this. So far i have a glued triple 2x12 dimensional lumber. I have ceiling joists that are 16 inches o.c. that expand 12 feet each direction and are 2x6. There are no supporting braces coming down at all from roof...
Sorry i actually have a pic of roof. Standard hip roof that is hand built with cross members running width of roof. In red circle is where wall is that i am removing.
I agree i dont see no reason why the cinder block piers couldnt handle the load. I think doing it that will prolly be easier than trying ti have the 2 middle posts try to help support the ceiling.
Will i really have to worry about point loads for the two center posts if i have a lvl load beam put in with king studs on the outside to support the lvl beam. The lvl beam should take weight off the two center posts correct? The outside king studs should fall right over the cinder block piers.