I had some stucco work done and the contractor recommended adding kickout flashing which I knew was the right thing to do, but it was installed differently than I expected. It comes out in front of the stucco trim instead of to the side of it. It's an eyesore. If I'd done it I would have installed the flashing 3" farther up the roof so the corner of the last shingle was in the corner of the flashing and the flashing would come out of the side of the trim instead of coming out of the front of it. Is the way it's done wrong? Is the way I want it done wrong? Would I have any argument for telling the contractor to redo it?
Last edited: