supporting flush beam joists.

Discussion in 'Decks & Patios' started by illectric, Aug 31, 2010.

  1. Aug 31, 2010 #1

    illectric

    illectric

    illectric

    New Member

    Joined:
    Aug 31, 2010
    Messages:
    2
    Likes Received:
    0
    Im looking to do a low level deck with flush mounted beams and no cantilevering.

    Beam in the middle supported by concrete piers going end to end. Should i make one large beam or have two that meet on a pier.

    Side A is a 2x8 ledger

    My question is if i put a pier at F1, F2, D1, D2, B2 will sides G, E, and C have enough support for the joists. Or would i have to put a pier at every point.

    Thank you.
     
  2. Sep 2, 2010 #2

    illectric

    illectric

    illectric

    New Member

    Joined:
    Aug 31, 2010
    Messages:
    2
    Likes Received:
    0
    a picture of the framing and pier placement.

    yellow are doubled
    green is the ledger
    red are the piers.
     