My wife and I bought an Older house in a nice location but we knew the kitchen was a gut job. Our plan was to install supplemental beams under the floor to fix sagging floor joists, Remove a section of the wall on the right side of the photo, tear out the cabinets and wall paneling to the studs, re-do the wiring, adding grounds and GFCI/Arc protection and create some new circuits for micro, refrigerator, garbage disposal, etc. Install new cabinets and countertops, install new flooring, and fix the ceiling.