Ceiling Cracks

Discussion in 'Walls and Ceilings' started by Soparklion, Nov 3, 2013.

  1. Nov 3, 2013 #1

    Soparklion

    Soparklion

    Soparklion

    Member

    Joined:
    Apr 28, 2008
    Messages:
    8
    Likes Received:
    0
    I just purchased a home that was built in the 1940s. There are multiple areas with cracks in the ceiling that seem to indicate that it was finished with drywall boards ~16 x 48" and the joints were not taped. No plaster covering either, simply jointed with drywall compound without tape.

    I'm considering covering it all with 3/8" drywall, but I really don't want to remove the crown molding...
    I despise popcorn ceilings.
    If I do drywall it all, can I use liquid nails to hold the new drywall in place? Then I wouldn't have to cover nail holes...

    All thoughts appreciated.
     
  2. Nov 4, 2013 #2

    bud16415

    bud16415

    bud16415

    Fixer Upper Staff Member Admin Moderator

    Joined:
    Feb 5, 2013
    Messages:
    4,657
    Likes Received:
    1,597
    I’m not a fan of 3/8 drywall for skinning over like that. You will still have all the seems to tape, so screw holes won’t add any significant amount of work. Liquid nails would hold it maybe but you are going to have to hold the sheet up there until it sets up and that’s going to be a long process. I just put half inch up to cover about 650 sq ft of ceiling and it’s a big job. In two rooms I went right over the existing plaster and found all the joists to attach the sheets to. In the one room the ceiling had many bad places and was all out of flat so I shimmed and striped it down to be flat. Attaching all the strips into joists.

    Without knowing what condition yours is without seeing a photo. I would suggest the simplest and most cost effective would be to mesh tape all those seems and then skim the whole ceiling.
     
  3. Nov 4, 2013 #3

    nealtw

    nealtw

    nealtw

    Contractor retired

    Joined:
    Nov 4, 2010
    Messages:
    23,892
    Likes Received:
    3,117
    Glue might hold the drywall up, but you would be hoping the back paper is going to hold to the center. Doubtful at best. Not sure how you would finish to the molding and what that would look like.
     
  4. Nov 5, 2013 #4

    Drywallinfo

    Drywallinfo

    Drywallinfo

    Well-Known Member

    Joined:
    May 21, 2013
    Messages:
    152
    Likes Received:
    36
    I would definitely not go with only glue - it would be very difficult to hold in place while setting and also would probably give way with time. Cover with 1/2" "sag-resistant" drywall made for ceilings, screwed in place with long-enough screws, using extra screws. Screw depressions are not hard to fill, just skim over, and repeat with more coats a few times after the mud dries - and many of the screws are covered in the taping process. You can rent a lift or construct a T-brace to hold up the sheet while fastening (with help). For help on taping and finishing, see http://www.drywallinfo.com/
     
    Last edited: Nov 5, 2013
    nealtw likes this.
  5. Nov 5, 2013 #5

    DFBonnett

    DFBonnett

    DFBonnett

    Retired decorating contractor

    Joined:
    Apr 17, 2012
    Messages:
    208
    Likes Received:
    61
    OP,
    In similar situations I've used 36" wide self-adhesive fiber glass matting on whole rooms. It's just like the tape but wide. Naturally, there is a lot of spackling involved but it does give an excellent result. Another possibility is to install a paintable wall covering on the ceiling. Brewster Anagypt RD5000 looks promising.
    FWIW
    YMMV
     

Share This Page