Im having 6 concrete piers poured ,holes already there,and wanted to know if $25 an hour is a good rate .I have the supplies.
Also is anything i need to be sure to get done or supply for it before hand like tubes,steel rods,gravel etc / and tips to look out for as the work is done .
Any info is appreciated
Also is anything i need to be sure to get done or supply for it before hand like tubes,steel rods,gravel etc / and tips to look out for as the work is done .
Any info is appreciated