I am having a room built (16x20), with gabo roof style. The contractor finished about 70% of the framing (half of the cable roof is done). My roof is not taken apart yet.
Plywood has been installed on the walls but not the roof. Floor is concrete slab.
I seen many times where it rains, the framing wasn't covered. Any issue with the joist 16 ft long (2x8) sagging later (those hold drywall ceiling)?
I have a few large tarps (19x23) but its a pain to cover that myself. Raining here in Southern Calif will be about 5 hours long
Thanks,
TT
Plywood has been installed on the walls but not the roof. Floor is concrete slab.
I seen many times where it rains, the framing wasn't covered. Any issue with the joist 16 ft long (2x8) sagging later (those hold drywall ceiling)?
I have a few large tarps (19x23) but its a pain to cover that myself. Raining here in Southern Calif will be about 5 hours long
Thanks,
TT
Last edited: