drumz
Well-Known Member
- Joined
- Jul 10, 2011
- Messages
- 75
- Reaction score
- 9
I am putting in a bathroom in an area of my basement that has a concrete floor with small bumps, old epoxy and a spot where the original oil tank for the heater resided - tile would be uneven unless i put a really thick layer of thinset. Tiling the bathroom area while the remaining 200 sf will be cork with a heavy pad. So my question is should I rent a concrete grinder or use leveling cement where I'm tiling (I am also putting in a radiant floor and a curbless shower) so the floor has to be perfectly smooth in the bathroom area. A heavy pad will be enough under the cork.
I have a plumber coming in @ 3 weeks to lay pipe to connect the toilet and shower to the floor drain (sink already connected) and a mason following a few days later to do the shower pan and wondering if I should do my floor prep before or after.
Any tips appreciated!
I have a plumber coming in @ 3 weeks to lay pipe to connect the toilet and shower to the floor drain (sink already connected) and a mason following a few days later to do the shower pan and wondering if I should do my floor prep before or after.
Any tips appreciated!