As I mentioned in an earlier post, I am about to pour the concrete floor for my basement project. I'll be doing this in sections that match how I would have cut the control joints if I did the whole floor in one shot.
I'm wondering how to do the vapor barrier. I've been reading that even small pinholes should be avoided if possible. If I lay one big sheet of plastic, there will be some parts that will get pretty chewed up by the time I get to pouring concrete on them. On the other hand if I lay the plastic down in sections like the concrete, I'll have a lot of seams to try to seal with tape and I'm doubtful that tape would stand the test of time.
Any thoughts on this? Thanks again.
I'm wondering how to do the vapor barrier. I've been reading that even small pinholes should be avoided if possible. If I lay one big sheet of plastic, there will be some parts that will get pretty chewed up by the time I get to pouring concrete on them. On the other hand if I lay the plastic down in sections like the concrete, I'll have a lot of seams to try to seal with tape and I'm doubtful that tape would stand the test of time.
Any thoughts on this? Thanks again.