I’m not sure if I worded that right but I put in a concrete base for a flagpole. I used three bags, but still came up short. I’d like it to be almost flush with the top of the sleeve you see in the picture. Without drilling holes for rebar, can I just add another bag of concrete on top of the current base? It’s not really going to be supporting much, as I’ve already got the three bags in the ground supporting the sleeve; it would only be for lateral support of that 4” of exposed sleeve.
Thanks
Thanks