drumz
Well-Known Member
- Joined
- Jul 10, 2011
- Messages
- 75
- Reaction score
- 9
I'm making box steps out of 4x8 pressure treated lumber with each one sitting on the other down to my driveway 4' below the front step to the house. I'm planning on using 5" x 3/8" lag bolts but not sure if I can get away with 2 for each end or if I should go with 3.
Thanks in advance for your time d;-)>
Thanks in advance for your time d;-)>