Hi guys.
I'm going to replace my primary sump pump in a few days and just decided to pretty much rework the way the last plumber ran the backup discharge into the same discharge as the main pump which is typical.
I decided two main objectives:
1) rework the setup into two separate discharges.
2) more importantly, to make future maintenance of cleaning pumps and the pit debris easier by installing either a Fernco clamp or a metal style fernco (mission clamp) with the metal jacket, below the check valve just below the crock lid in the pit so it's not sitting submerged. My "silent" check valves are new and they have Fernco's on each end of them and are to snug in there to remove I'll have to cut the discharge pipe below the check valves to get the pumps out for maintenance. I really don't want to cut and replace piping every time I do maintenance. This is why I think a fernco down low would make perfect sense.
Question is, is it ok to install a fernco on a 1hp pump for this "ease of removal" plan and if so is it ok to use the ones that have the metal jacket around the rubber? I was thinking that the metal jacket ones would be stronger and lower the risk of the thing rupturing and blowing water everywhere lol. I've heard mixed things about both doing this plan and the use of metal jacket fernco clamps because they don't add as much fit compression because of the jacket on them? My other idea was to use a pvc union just for ease of pump removal, but was thinking unions tend to come loose easily especially with vibrations of pumps and what not.
Please guys, any advice is appreciated. Thx
I'm going to replace my primary sump pump in a few days and just decided to pretty much rework the way the last plumber ran the backup discharge into the same discharge as the main pump which is typical.
I decided two main objectives:
1) rework the setup into two separate discharges.
2) more importantly, to make future maintenance of cleaning pumps and the pit debris easier by installing either a Fernco clamp or a metal style fernco (mission clamp) with the metal jacket, below the check valve just below the crock lid in the pit so it's not sitting submerged. My "silent" check valves are new and they have Fernco's on each end of them and are to snug in there to remove I'll have to cut the discharge pipe below the check valves to get the pumps out for maintenance. I really don't want to cut and replace piping every time I do maintenance. This is why I think a fernco down low would make perfect sense.
Question is, is it ok to install a fernco on a 1hp pump for this "ease of removal" plan and if so is it ok to use the ones that have the metal jacket around the rubber? I was thinking that the metal jacket ones would be stronger and lower the risk of the thing rupturing and blowing water everywhere lol. I've heard mixed things about both doing this plan and the use of metal jacket fernco clamps because they don't add as much fit compression because of the jacket on them? My other idea was to use a pvc union just for ease of pump removal, but was thinking unions tend to come loose easily especially with vibrations of pumps and what not.
Please guys, any advice is appreciated. Thx
Attachments
Last edited: