austinbirdman
New Member
- Joined
- Oct 21, 2006
- Messages
- 3
- Reaction score
- 0
Hey, just wondering if anyone can help me with this. I am using a local small-job contractor to put a pier-and-beam foundation under a 504 s.f. addition that we are then building ourselves. Anyone know what the rough costs for this ought to be? It's on normal soil with a very moderate grade. The piers will be about 2' tall each sitting on 2'x2'x1' footings that are 2' below grade. There are 13 piers-on-footings in all, following the engineer's plan.
Any estimate even very rough will be appreciated. - J.B. Bird, Austin, Texas
Any estimate even very rough will be appreciated. - J.B. Bird, Austin, Texas