zannej
Well-Known Member
- Joined
- Jun 5, 2014
- Messages
- 4,070
- Reaction score
- 1,801
I wish I could remember who I spoke to at the DA's office. But I know who the probation officer is and he hasn't had her check-in in over 6 months-- so he's dropped the ball. He wasn't in the office on Friday. They said he's always out on Fridays and that he won't be back in until Monday.Good for you for trying. And don't tell anybody if you don't have to. You don't need any enemies and your friends already know you're a friend. keep a record of who you talk to, so if anything happens to the kid, you'll know who screwed up.
I also need to find out who the current DA is. My favorite teacher's son used to be the DA but I don't know if he still is. Latest info I found is from 2015.
I hope you get feeling better. Have you thought of getting RF (radio frequency) treatments? They numb the nerves. Or is that what you've been getting?Today I plan to have no pain after 23 days.
A week ago last Thursday I had a spinal injection that worked for 2 days and then the relief was gone. This last Thursday they gave me 2 shots. 2 days later I'm still good. Just a wait and see how things go from hear.
I helped my friend with his bathroom some more today. Had to take his girlfriend to the store to distract her because his ex was over (because the ex's current boyfriend is helping him). I don't know where the kids were. His ex doesn't like to actually watch her kids and doesn't like to be left alone with them because then she's responsible for them. She's also a total biyatch to the current girlfriend and does stuff to antagonize her when my friend isn't looking. She was doing it again today so I went over to intervene. She knows not to mess with her when I'm around.
There was an accident in a parking lot near my friend's house. It looks like a small black car ran under the side of an 18-wheeler tanker. The kind of tanker that carries explosive materials too. Cops, fire department, and ambulance were all there.
Anyway, back to the renovations, I supplied the plumbing parts. Found a decent vanity online and transported it for my friend. He's using the layout I suggested and he went by a diagram I drew for the pipes (he didn't know about vents). He had to deviate a little because of a large floor beam. I didn't get to see what he did under the house. He has the shower set in place but still needs to put sealant under and around it to protect from water damage. He's going to build a wall around the 3rd side. He'll put an AAV inside that wall with an access / vent panel. There is a huge vent pipe connected to the toilet that goes out through the roof but it is cast iron and he couldn't tie in to it. The old lav is still on the wall and he's trying to figure out how to disconnect it and remove it, but it's some sort of copper and there are no shutoffs.
Here's the before (after he tore the original floor out bc it was rotted all the way to the joists)
Here's what he did with the joists (with help). His helper made the mistake of putting them 16" on center instead of 24" so it had to have extra reinforcements added underneath. They got the shower temporarily in place and connected to test how things hook up. Also got the drain stuff temporarily hooked up. I can't fit the pic of the opposite wall where the old shower used to be.
After he got the toilet set in with a new flange- it's turned at a slight angle for leg space. He wanted to move it over but lav was in the way and it tied in to cast iron and was a pain to deal with.
Here's what it currently looks like: