NorPlan
Junior Member
The Present Retaining Wall over the Ditch to the Laneway entering the Property needs Replacing.. It's made out of 6X6 Timbers.. The plan is to use the present wall as a Form on one side and Dig a Trench along the Inside (18" Thick by 13' Long by 4' High)... Cost Wise the Debate is whether to (1) Have Ready Mix Concrete trucked in or (2) Buy the Required # of Bags and Mix on site... Also the formula used to calculate how much cement would be needed ?? Thoughts & Opinions Appreciated, Cheers Thanks